Our island. Our future.

South Pender Island. Our home. Our say.

Bring local choices home. Ask BC to study a town with a council we elect. Show the costs. Let residents weigh the plan.

Read and sign the study request
An illustration of island life

At a glance

A signature starts a request.

  1. 01

    Ask BC

    Sign the request for a town study.

  2. 02

    Test the plan

    A study should set out costs, services and choices.

  3. 03

    Let people decide

    A later vote is a separate step if the plan goes ahead.

A signature asks for a study. It does not approve a town or cast a later vote.

Sources for this guide

South Pender Island. Our home. Our say.

A council we elect. A voice that counts. A future we help shape.

Ask BC to start the study for South Pender Island to become a town.

Start the town study. Add your name.

Signing asks for a study. Any later vote on becoming a town is a separate step.

Private project. The petition is open. Read the public records and ask BC to study a town for South Pender Island. We want a council we elect. This private campaign does not speak for the whole island.

The exact petition

We, the undersigned, call on the Province of British Columbia to study incorporating South Pender Island as its own municipality, with a council its residents elect and the ordinary powers of a BC municipality. Under current law that municipality would be an island municipality for as long as the Islands Trust area exists (Local Government Act s. 6). This petition is for a town. It is not a promise to keep the Islands Trust. Abolishing the Trust — and returning planning either to a municipality or to the regional district — is a separate petition at abolishislandstrust.org.

Petition text version 2. Read the revision history.

Latest from Islands Trust

Checked

Public-notification Bylaw 131 adopted

The Trust’s published text records adoption of Public Notification Bylaw 131 on October 9, following Executive approval on September 23. Section 2 provides for notices on the Trust website and in a monthly print publication. This supersedes our earlier statement that local adoption was unverified. The newly posted adopted August 28 minutes also confirm adoption of the amended local enforcement policy (SP-2026-040); the meeting date is August, rather than the later date the minutes appeared online.

South Pender Bylaw 131, published adopted text, page 1

Read the full update and sources →

The people who keep South Pender Island working

A job has a price.
So does the trip.

Pick a job. See its pay in four places. Then see what firms charge to make an island visit. We want more homes for workers and room for local firms.

Explore pay and work costs

516jobs to explore

4broad pay benchmarks

  1. Choose a job
  2. Compare its pay
  3. Check the trip costs

Default pay uses September 2026 dollars. Original pay is one click away. Each region and source is named.

Fair enforcement. Decisions we can see.

Our local trust committee can choose what to enforce first. It can tell staff to close a file. Staff check the facts and handle notices. Show us how those powers are used. Each island's bylaw and screening rules must be checked separately.

Who controls enforcement and adjudication →

The full case. Sources and details.

Two petitions. Two decisions.

Ask BC to study a town with a council we elect. Read the exact request above. While the Trust area exists, current law calls a new town wholly within it an island municipality. That is a rule we face. It is not a promise to keep the Trust.

The separate petition asks BC to end the Trust. A town would take on planning where there is one. Elsewhere, the regional district would do it. Sign one petition, both, or neither.

The island, on the record

349 parcels across 982 hectares, mapped and inspectable. 197 Islands Trust meetings archived since 2012.

These counts cover the land lots in our stored South Pender Island map region. We leave out water lots. The mapped area is the sum of those lots, not a fresh survey of the island’s shore.

Statistics Canada counted 306 residents on South Pender Island in the 2021 census. The 2016 count was 235. That is a change of +30.2% in five years. The 2021 census counted 215 private dwellings. Usual residents lived in 153. That left 28.8% without usual residents on Census Day. This is not a count of homes empty all year. The middle age in 2021 was 65.5. In that year, about 295 residents were adults, age 18 or over. This is an estimate. Statistics Canada does not publish that age split for this place. These figures cover South Pender Island Trust Area, the place Statistics Canada names in its table. Source: Statistics Canada, Table 98-10-0012-01 — Population and dwelling counts: Canada and designated places (2021 Census).

2026 trustee election — Official winners declared

Benjamin McConchie: 112 votes (declared elected); John Kuharchuk: 110 votes (declared elected); Kristina Evans: 103 votes; Dag Falck: 89 votes. The Trust’s October 22 release confirms the two winners. Candidate vote totals are from the Trust’s separately labelled preliminary table, rechecked November 1.

Results checked on 1 November 2026 against the Trust’s October 22 confirmation release. The twelve local trust areas have confirmed elected or acclaimed trustees. Bowen’s municipal appointments remain pending until November 9. Candidate vote totals and confirmation of the winners are separate records. Trustees are scheduled to be sworn in on November 12.

Islands Trust, candidate vote totals; winners confirmed in the October 22 release below

Public-record check · 1 November 2026

Public-notification Bylaw 131 adopted

The Trust’s published text records adoption of Public Notification Bylaw 131 on October 9, following Executive approval on September 23. Section 2 provides for notices on the Trust website and in a monthly print publication. This supersedes our earlier statement that local adoption was unverified. The newly posted adopted August 28 minutes also confirm adoption of the amended local enforcement policy (SP-2026-040); the meeting date is August, rather than the later date the minutes appeared online.

South Pender Bylaw 131, published adopted text, page 1

Adopted South Pender minutes, August 28, page 9

The incoming Trust Council

The Trust’s October 22 release confirms the elected or acclaimed trustees for the twelve local trust areas. Bowen’s municipal appointments remain pending until November 9. Trustees are scheduled to be sworn in on November 12, with inaugural Council meetings on November 13 and 14. The current term and the incoming term are distinct.

Trustee confirmation release, October 22

Ferry funding: the federal response

In an October 27 letter to the Trust, the federal Transport Minister describes the existing coastal ferry subsidy agreement. The letter puts the 2026–27 grant to British Columbia at approximately $38.6 million and says the Province determines which ferry services receive assistance. It directs questions about fares and service costs to the Province. This is a response about existing arrangements, rather than an announcement of a new local ferry service or fare reduction.

Federal Transport Minister’s response, October 27, pages 1–2

Other local votes · checked 21 October

The CRD also lists Rob Fawcett elected by acclamation as Southern Gulf Islands Electoral Area director. This is a regional-district office, separate from the Islands Trust trustee seats.

CRD, general local election results and acclamations

This is a dated status check, not a full re-audit of every bylaw. Read the Firestarter.

A quiet island sharing a Local Trust Committee history with North Pender.

Latest research and writing

New reports come first. Open each piece to check its sources.

  • The Trustee Who Said No Published August 16, 2026; revised September 10, 2026
    South Pender’s elected trustee opposed the 2022 draft budget; Trust Council chose a revised budget. The record also documents office closures and a later policy-statement consultation. These are arguments about shared decision-making, not proof that a local vote has no effect.

Water: the groundwater under South Pender Island

BC’s records link one aquifer to the stored South Pender Island parcel region; the main one is linked to 348 regional land parcels, with 242 well records across the selected aquifers in full. We group records by the lots in our stored map. This is not a count of every well inside the island’s shore. BC supplies the ratings. These well totals cover each selected aquifer in full. Full water report for South Pender Island →

  • Aquifer 710 — South Pender: Bedrock — Fractured sedimentary rock, 9.1 km², mapped 2004. Vulnerability Moderate; productivity Low; demand Moderate; 242 wells on record; 0 water licences. BC factsheet

A High vulnerability rating means less natural cover protects the water from waste at the surface. It does not mean the water is dirty now. Source: Ground Water Aquifers — BC Data Catalogue (Open Government Licence — BC) and the Province's GWELLS registry.

Ferry tracker

Otter Bay via the canal bridge (Southern Gulf Islands routes) — live sailings and vessel positions sit at the top of this page. Official schedules: www.bcferries.com/routes-fares/schedules.

Ownership and relationship

Private, personal project. South Pender Town is built and run by Tony Aly, a publisher and software builder on Denman Island. It is his private campaign. No government or local group runs or endorses it.

The linked Abolish Islands Trust campaign asks BC to change the law and end the Trust. A future island group may choose a different path.

A domain is not a local chapter.

Keep going

More for our island

01Homes and island life02Water03Building rules04Pay and work costs05Island news06Who has signed